评估固态变压器中冗余设计的效益:一种扩展的总拥有成本模型

Assessing the Benefits of Redundancy in Solid-State Transformers: An Extended Total Cost of Ownership Model

作者 Antonis Stathatos · Samuel S. Queiroz · Chengmin Li · Levy F. Costa · Claudia Fecarotti · George Papafotiou
期刊 IEEE Transactions on Power Delivery
出版日期 2025年9月
技术分类 储能系统技术
技术标签 储能系统 三电平 可靠性分析
相关度评分 ★★★★★ 5.0 / 5.0
关键词 直流固态变压器 可靠性模型 总拥有成本 冗余子模块 设计决策
语言:

中文摘要

直流-直流固态变压器(SST)在中压应用中日益普及。其模块化结构具备实现高可靠性的潜力,但尚缺乏兼顾可靠性与最小总拥有成本的设计方法。本文提出一种包含早期失效、随机故障和老化失效的SST直流级可靠性模型,并对比了两电平全桥与三电平半桥两种子模块结构。同时,建立了涵盖安装、运行、维修及停机成本的总拥有成本解析表达式,并以冗余子模块数量为变量构建优化问题。案例分析表明,尽管初始投资增加,冗余设计可显著降低全生命周期总成本,且停机成本与故障恢复速度对设计决策影响显著。

English Abstract

DC-DC solid-state transformer (SST) is becoming more and more popular for medium voltage applications. This topology, due to its modularity, has the potential to present high levels of reliability. However, there is a lack of a proper design method that ensures reliable converter operation with minimal total cost of ownership. In this paper, a reliability model of the DC-DC stage of the SST is presented that includes infant mortality, random failures, and aging failures while considering and comparing the 2-level full-bridge and the 3-level half-bridge as possible submodule configurations, which are conventional solutions in SST systems. Furthermore, an analytical expression on the total cost of ownership of the converter is developed which includes installation, operation, repair, and downtime costs. A minimization problem is then formed with objective function the total cost of ownership and the number of redundant submodules as degrees of freedom. A case study is given to demonstrate the analysis and conclusions that can be drawn using the proposed method. The analysis shows that despite the increase in initial investment costs, redundancy can lead to significant reductions in total cost of ownership over the lifetime of the converter. In addition, design decisions can be severely impacted by the cost of downtime and the ability to restore the operation of the converter quickly after a fault.
S

SunView 深度解读

该SST冗余设计与TCO优化方法对阳光电源ST系列储能变流器和PowerTitan大型储能系统具有重要应用价值。研究提出的三电平半桥与两电平全桥对比分析,可直接指导阳光电源三电平拓扑的冗余配置优化,在保证高可靠性前提下平衡初始投资与全生命周期成本。其涵盖早期失效、随机故障和老化失效的可靠性模型,可完善iSolarCloud平台的预测性维护算法,通过量化停机成本与故障恢复速度的影响,优化备件配置策略。该方法论同样适用于SG系列1500V光伏逆变器和充电桩产品的模块化冗余设计,助力阳光电源在大型储能和光伏电站项目中提升系统可用性并降低运维成本。